ACT OF JSC UKRELEKTROMASH DATED 18.01.2001

Compressor 2VM 4-24/9 M-1: output rose and holds up under load

JSC Ukrelektromash, Kharkiv Electrical Engineering Plant  ·  boiler and compressor section  ·  approved by the plant's technical director F. F. Laptsevich

Kharkiv, Ukraine  ·  contract No. 91-P dated 01.12.2000 · measurements on 08.12.2000 and 18.01.2001

PRODUCTXADO compoundrestorative repair by XADO technology® · contract No. 91-P dated 01.12.2000
TEST OBJECTPiston compressor
2VM 4-24/9 M-1
compressor No. 8 of the boiler and compressor section · 3 m³ receiver, working pressure 8 atm
DOCUMENT TYPETechnical act,
signed by both parties
seal and the technical director's «Approved» endorsement

Key result

60%
compressor output, build-up to 8 atm: 1 min 36 s → 1 min 00 s
EQUIPMENTOPERATING CONDITIONSWHAT WAS MEASURED
Piston compressor 2VM 4-24/9 M-1, No. 8Boiler and compressor section of the plant, 3 m³ receiver, working pressure 8 atmTime to build working pressure from 0 to 8 atm

Measurements before and after the restorative repair

PARAMETERBEFORE REPAIR, 08.12.2000AFTER, 400 h OF OPERATION
Time to build working pressure from 0 to 8 atm1 min 36 s1 min 00 s
Compressor output by filling of the 3 m³ receiver100 %160 %

Output was determined from the time to fill the 3 m³ receiver to 8 atm; the standard instruments and sensors of the compressor unit were used for the measurements.

Conclusion of the plant commission

The commission of JSC Ukrelektromash — the deputy chief engineer, the head of the maintenance and repair shop, and the foreman of the boiler and compressor section — recorded: after the restorative repair of the compressor 2VM 4-24/9 M-1 by XADO technology® using the XADO compound, the time to build working pressure in the 3 m³ receiver fell from 1 min 36 s to 1 min 00 s. The «after» measurement was taken at 400 hours of operation, so the effect holds on a working machine, not only in the first hours after treatment. The act's conclusion verbatim: «The results obtained indicate the expediency of carrying out restorative repair by XADO technology® on all industrial equipment» of the plant. The act was approved by the plant's technical director under seal.

The results relate to the piston compressor 2VM 4-24/9 M-1 of the boiler and compressor section of JSC Ukrelektromash and to the duty of filling a 3 m³ receiver to 8 atm; on other equipment and in other duties the figures may differ. The original act with signatures and seal is published in full and available for download.

Current equivalent

Revitalizant gel for compressors and bearings →

Piston, screw and centrifugal compressors; rolling and sliding bearings running in an oil bath; machine-tool spindle units and slideways.

How such units are treated: Compressor

← Full catalogue