ACT OF JSC UKRELEKTROMASH DATED 18.01.2001
Compressor 2VM 4-24/9 M-1: output rose and holds up under load
2VM 4-24/9 M-1compressor No. 8 of the boiler and compressor section · 3 m³ receiver, working pressure 8 atm
signed by both partiesseal and the technical director's «Approved» endorsement
Key result
| EQUIPMENT | OPERATING CONDITIONS | WHAT WAS MEASURED |
|---|---|---|
| Piston compressor 2VM 4-24/9 M-1, No. 8 | Boiler and compressor section of the plant, 3 m³ receiver, working pressure 8 atm | Time to build working pressure from 0 to 8 atm |
Measurements before and after the restorative repair
| PARAMETER | BEFORE REPAIR, 08.12.2000 | AFTER, 400 h OF OPERATION |
|---|---|---|
| Time to build working pressure from 0 to 8 atm | 1 min 36 s | 1 min 00 s |
| Compressor output by filling of the 3 m³ receiver | 100 % | 160 % |
Output was determined from the time to fill the 3 m³ receiver to 8 atm; the standard instruments and sensors of the compressor unit were used for the measurements.
Conclusion of the plant commission
The results relate to the piston compressor 2VM 4-24/9 M-1 of the boiler and compressor section of JSC Ukrelektromash and to the duty of filling a 3 m³ receiver to 8 atm; on other equipment and in other duties the figures may differ. The original act with signatures and seal is published in full and available for download.