WORK COMPLETION CERTIFICATE · DNEPROMETIZ JSC
PKS 1.75U compressor: more air, less current no disassembly, in normal service
signed and stamped by both parties
Key results
| EQUIPMENT | HOW IT WAS TREATED | WHAT WAS MEASURED |
|---|---|---|
| PKS 1.75U compressor | No disassembly, in normal operating service | Fill time at 3.8 kgf/cm², current draw |
PKS 1.75U compressor — measurements before and after treatment
| PARAMETER | BEFORE | AFTER | CHANGE |
|---|---|---|---|
| Fill time at a pressure of 3.8 kgf/cm² | 30 s | 22 s | output +36 % |
| Current draw | 25 A | 21 A | −16 % |
The measurements were taken on the running compressor, before and after treatment — at one and the same pressure of 3.8 kgf/cm².
Conclusion of the certificate
The results apply to the PKS 1.75U compressor treated in normal operating service at Dneprometiz JSC; on other machines and in other operating modes the figures may differ. The work was performed and the certificate drawn up by the contractor Azurit Ltd. The original certificate of 10.01.2001 with signatures and stamps is published in full and available for download.
Current equivalent
Revitalizant gel for compressors and bearings →
Piston, screw and centrifugal compressors; rolling and sliding bearings running in an oil bath; machine-tool spindle units and slideways.
How such units are treated:
