Turbocompressor K-500-61-1, st. No. 1 — Kharkiv Tractor Plant

← Full catalogue

INDUSTRIAL CASE|MECHANICAL ENGINEERING|TURBOCOMPRESSOR · BEARINGS

CERTIFICATE OF REPAIR AND RESTORATION WORK · CONTRACT No. 72-45-1140

Turbocompressor K-500-61-1: electricity savings and stable bearing operation

JSC Kharkiv Tractor Plant named after S. Ordzhonikidze, power shop  ·  approved by: Chief Power Engineer G. A. Donets, Head of the Power Shop  ·  work performed by: XADO LLC

Kharkiv, Ukraine  ·  contract No. 72-45-1140 of 26.07.2000

PRODUCTXADO RVSrepair and restoration compound · treatment in three stages
TREATED OBJECTTurbocompressor K-500-61-1station No. 1, plant power shop · plain bearings, gearbox, lubrication system, electric drive
DOCUMENT TYPECertificate of completed work
with calculation annex
signatures and seals of JSC KhTZ and XADO LLC

Key results

9-11%
electricity consumption of the turbocompressor in normal operation
11.5%
main oil pump pressure, 5.2 → 5.8 kgf/cm²
EQUIPMENTUNITWHAT WAS MEASURED
Turbocompressor K-500-61-1, st. No. 1Lubrication system, main oil pumpOil pressure
Turbocompressor K-500-61-1, st. No. 1Plain bearings Nos. 1, 2, 3, 5, 6, 7, 8Temperature at seven points
Turbocompressor K-500-61-1, st. No. 1Electric drive of the unitElectricity consumption
Turbocompressor K-500-61-1, st. No. 1GearboxOperating noise

Results by turbocompressor unit

UNITPARAMETERRESULT
Lubrication systemMain oil pump pressure5.2 → 5.8 kgf/cm² — a gain of 0.6 kgf/cm², pressure stabilised
Electric driveElectricity consumptionReduction of 9-11 %
Plain bearingsTemperature at seven points (Nos. 1, 2, 3, 5, 6, 7, 8)Brought to the working norm and stabilised
GearboxOperating noiseReduction noted by the operating personnel

Oil pressure, bearing temperature and electricity consumption were taken with the turbocompressor's standard instruments before and after the three treatment stages.

What the commission recorded

Following the repair and restoration work, the commission of the plant and the contractor recorded: 1. The oil pressure created by the main oil pump increased by 0.6 kgf/cm² and stabilised (was 5.2 kgf/cm², became 5.8 kgf/cm²). 2. The temperature of the plain bearings was brought to the working norm and stabilised (bearings Nos. 1, 2, 3, 5, 6, 7, 8). 3. Reduction of electricity consumption by 9-11 %. 4. The operating personnel note a reduction in the operating noise of the turbocompressor gearbox. The annual economic effect from electricity savings alone is estimated in the annex to the certificate at UAH 90,576 in year-2000 prices.

The results refer to turbocompressor K-500-61-1, st. No. 1 of the power shop of JSC KhTZ; on other units and operating modes the figures may differ. The calculation of the annual effect in year-2000 prices was made by the contractor XADO LLC and approved by the plant's Chief Power Engineer. RVS is an obsolete XADO designation, zero-generation compounds; the current product generation is revitalizants. The original certificate is published in full and available for download.