ECONOMIC EFFICIENCY CALCULATION APPROVED BY THE ENTERPRISE
Heat-supply units: lower current, quieter running, rarer bearing service
calculation, approved
by the enterprise
Key result
| OBJECT | POWER | WHAT WAS MEASURED |
|---|---|---|
| Unit No. 1, 107 Pyrohova St. | 75 kW | Current on each phase before treatment and 180 h after it |
| Units No. 1-4, 1 Medvedeva St. | 90 kW | Current on each phase before treatment and 180 h after it |
| Other units of the enterprise | 75-630 kW | Running noise, interval between bearing services |
Phase current 180 hours after treatment
| OBJECT | BEFORE TREATMENT | AFTER 180 H | CHANGE |
|---|---|---|---|
| Unit No. 1, 107 Pyrohova St. (75 kW) | 126 A | 124 A | −2 A |
| Units No. 1-4, 1 Medvedeva St. (90 kW) | 130 A | 126 A | −4 A (3.07 %) |
Current was measured on each phase, mains voltage 380 V; the enterprise attributes the lower consumption to the reduced friction coefficient in the bearings.
Electricity saving over the heating season — calculation by the enterprise
| OBJECT | CURRENT REDUCTION | SAVING OVER THE HEATING SEASON | SHARE OF SAVING |
|---|---|---|---|
| Unit No. 1, 107 Pyrohova St. | 2 A | 3597.3 kWh | 1.58 % |
| 1 Medvedeva St. — two units | 4 A | 14 389 kWh | 3.07 % |
The saving was calculated by the enterprise with the formula E = 1.73·U·I·n·cos φ·k at U = 380 V, n = 2880 h of operation over the heating season and cos φ = 0.95.
Conclusion of the enterprise
The results relate to units with 380 V electric drives rated 75-630 kW at the sites of VOK PTM Vinnytsiateplokomunenergo; with other units and operating modes the figures may differ. The original document with signatures and stamp is published in full and available for download.
Current equivalent
Revitalizant gel for compressors and bearings →
Piston, screw and centrifugal compressors; rolling and sliding bearings running in an oil bath; machine-tool spindle units and slideways.
How such units are treated: