RESTORATIVE REPAIR REPORTS · APRIL — MAY 2000
305 VP 30/8 compressors: faster pressure build-up and lower current on both units
dated 16.05.2000seal of JSC IuGOK · summary plant report dated 19.05.2000
What repeated on both machines
| COMPRESSOR | BASELINE → CONTROL MEASUREMENT | WHAT WAS MEASURED |
|---|---|---|
| 305 VP 30/8, station unit No. 2 | 11.04.2000 → 16.05.2000 | Pressure build-up time 0 → 5 atm · current draw at the 5 atm g mode |
| 305 VP 30/8, station unit No. 4 | 05.04.2000 → 16.05.2000 | Pressure build-up time 0 → 6 and 0 → 4 atm · current draw under loading |
The plant's conclusion on the results of the whole job
| No. | XADO TECHNOLOGY® MAKES IT POSSIBLE TO — PER THE CONCLUSION OF JSC IuGOK |
|---|---|
| 1 | Extend the service life of equipment without replacing assemblies and parts |
| 2 | Extend the overhaul interval of equipment |
| 3 | Cut equipment repair costs |
| 4 | Increase equipment output, reduce energy consumption |
| 5 | Extend oil service life, prevent wear and optimise clearances in mechanisms |
Report of JSC IuGOK dated 19.05.2000 on the results of the work on the plant's equipment (contract No. 158 dated 31.03.2000) — the customer's own assessment, not our measurement.
Pressure build-up time — by machine
| COMPRESSOR | BUILD-UP RANGE | BEFORE, MIN:S | AFTER, MIN:S | CHANGE |
|---|---|---|---|---|
| Station unit No. 2 | 0 → 5 atm | 3:43 | 2:46 | −57 s · −25.6 % |
| Station unit No. 4 | 0 → 6 atm | 4:15 | 3:09 | −66 s · −25.9 % |
| Station unit No. 4 | 0 → 4 atm | 2:26 | 2:04 | −22 s · −15.1 % |
Measurements before and after the repair were taken with the compressor unit's standard instruments at t = 54°; each machine has its own build-up range, so it is the change that is compared.
Current draw — by machine
| COMPRESSOR | MEASUREMENT MODE | BEFORE, A | AFTER, A | CHANGE |
|---|---|---|---|---|
| Station unit No. 2 | 5 atm g mode | 180 | 165 | −15 A · −8.3 % |
| Station unit No. 4 | Initial loading stage | 155 | 120 | −35 A · −22.6 % |
Current was read with the unit's standard instruments; the conditions before and after the repair match — t = 54°, the same stage pressures.
Conclusion for the series
The results relate to the 305 VP 30/8 piston compressors of the sinter shop at JSC IuGOK and to their operating modes; on other equipment and under other conditions the figures may differ. The original reports are published in full and available for download.