REPORTS ON THE APPLICATION OF XADO TECHNOLOGY · 2003
K-80-60-160 pump, fan and gearboxes: less friction loss and less electricity used
of XADO technologycustomer and contractor signatures, stamps, approval endorsement
Key results
| EQUIPMENT | DRIVE AND ASSEMBLIES | OPERATING TIME BEFORE MEASUREMENT | WHAT WAS MEASURED |
|---|---|---|---|
| P-1 supply fan of the UPKhG process pump station, inventory No. 23 | 4AM160S6: 11.0 kW, 975 rpm; 4 bearing assemblies | 170 h | Phase currents under load, bearing temperature |
| K-80-60-160 pump, boiler house of DKS “Smena” | AK11212U1: 7.5 kW, 3000 rpm; 4 assemblies | 430 h | Phase currents under load and at no load |
| Boiler house pump group: 3 continuously running units | Bearings of the motors and the pumps | 430 h, re-check after 6 months | Phase currents, temperature, noise |
| Washing machines of the laundry department, 25 kg | Gearboxes, 6 h of operation per day | 1100 h (6 months) | Phase currents |
K-80-60-160 pump with AK11212U1 motor — phase currents
| MODE AND MEASUREMENT | PHASE A | PHASE B | PHASE C |
|---|---|---|---|
| Under load, before treatment | 12.8 A | 11.6 A | 10.2 A |
| Under load, after 430 h of operation | 9.0 A | 9.0 A | 8.5 A |
| No load, before treatment | 12.8 A | 11.4 A | 9.8 A |
| No load, after 430 h of operation | 7.8 A | 7.7 A | 7.0 A |
| Under load, re-check after 6 months | 10.3 A | 10.2 A | 10.0 A |
Single-stage treatment, March 2003. The current stayed below the initial level even after six months of unit operation.
P-1 supply fan with 4AM160S6 motor — phase currents
| MODE AND MEASUREMENT | PHASE A | PHASE B | PHASE C |
|---|---|---|---|
| Under load, before treatment | 15 A | 15 A | 14 A |
| Under load, after 170 h of operation | 13.5 A | 13.5 A | 12.5 A |
| Motor with worn bearings, before treatment | 15.2 A | 15.5 A | 14.5 A |
| Same motor after treatment with “Repair” grease, 220 h | 15.2 A | 15.0 A | 13.8 A |
The first current drop was recorded after 100 h of operation. With the fan running around the clock, the report estimates the saving at 582 kWh per month.
Boiler house pump group and laundry department gearboxes, DKS “Smena”
| UNIT | WHAT WAS MEASURED | RESULT |
|---|---|---|
| Boiler house pump group, 3 continuously running units | Phase currents under load, 430 h | Drop of 2.7 A on average across the three phases |
| Same group, re-check after 6 months | Phase currents under load | Drop of 1.4 A against the initial values still holds |
| Washing machine gearboxes, 25 kg | Phase currents, 1100 h of operation | Drop of 0.9 A |
| Pump group, 3 units, six months of operation | Electricity saving | 10 400 kWh as calculated by the contractor |
The saving was calculated in the report from the current reduction that actually held with the units running around the clock.
Report conclusions
The results refer to the K-80-60-160 pump and the P-1 supply fan with AK11212U1 and 4AM160S6 motors, to the boiler house pump group and to the washing machine gearboxes under the operating conditions of GAO Chernomorneftegaz and DKS MZU “Smena”, 2003; on other equipment and in other duty cycles the figures may differ. The treatment and the saving calculations were performed by the contractor, ChPKP “Rigonda”. The original reports with signatures and stamps are published in full and available for download.
Current equivalent
- Revitalizant gel for compressors and bearingsCompressors · bearings · spindles
- Revitalizant gel for hydraulic systemsHydraulics · pumps · hydraulic motors
- Revitalizant gel for gearboxesGearboxes · transmissions · gear drives
How such units are treated: