REPORTS UNDER THE CONTRACT OF 04.12.2002 · FOUR MONTHS OF OBSERVATION
Turbo blower TV-175/1.6: less energy, bearings without regreasing
under the contract of 04.12.2002
Key results
| UNIT AND TREATED ASSEMBLY | CONDITION AT THE START OF TESTING | WHAT WAS MEASURED |
|---|---|---|
| Turbo blower TV-175/1.6, inv. No. V-4 — 250 kW, 3000 rpm, continuous duty at the WWTP | In service, current load 383 A against a rating of 385 ± 5 A | Daily electricity consumption by meter, current load |
| Turbine bearings (2) — XADO compressor gel into the 0.5 l oil bath | Running time 478 h as of 16.12.2002 | Running time between refills of the standard grease |
| Electric motor bearings (2) — XADO revitalizing and protective grease | Running time 478 h as of 16.12.2002 | Running time between refills of the standard grease |
Electricity: daily consumption before and after treatment
| PERIOD | DAILY CONSUMPTION, kWh | CHANGE |
|---|---|---|
| Before treatment, 09-16.12.2002 (7 days) | 5195.14 on average, 4989.6-5371.2 by day | — |
| After treatment, 25.01-09.02.2003 (16 days) | 4894 on average, 4665.6-5142 by day | −301.14 kWh/day · 5.8 % |
Metering by electricity meter No. 019204 (current transformers 600/5); readings were taken daily at 08.00.
Electricity: Q1 2003 by meter readings
| PERIOD | CALCULATED AT PRE-TREATMENT CONSUMPTION, kWh | ACTUAL BY METER, kWh | SAVINGS |
|---|---|---|---|
| 08.01-08.02.2003 | 145468.3 | 136893.60 | 8574.8 kWh · 5.9 % |
| 08.02-08.03.2003 | 145468.3 | 139108.80 | 6359.6 kWh · 4.4 % |
| 08.03-08.04.2003 | 161054.3 | 151730.40 | 9323.9 kWh · 5.8 % |
| Total for the quarter, 87 days of operation | 451991 | 427732.8 | 24258.3 kWh · 5.4 % |
The report conclusions state savings of 6.9 % for the month of the experiment — this figure also covers the turbine bearing cooling pump (3.3 kW) taken out of service.
Bearings and current load of the electric motor
| PARAMETER | BEFORE TREATMENT | AFTER TREATMENT |
|---|---|---|
| Bearing running time without refilling the standard grease | per schedule — every 1000 h | 1654 h of operation with no stop for regreasing |
| Current load of the electric motor, rating 385 ± 5 A | 383 A | 330 A |
| Turbine bearing cooling pump, 3.3 kW | in operation | taken out of service, 5512.32 kWh per quarter |
The plant's standard schedule calls for grease refilling of the bearings every 1000 h; during the observation period the machine was not stopped for regreasing.
Report conclusions
The results relate to the 250 kW TV-175/1.6 turbo blower at the Evpatoria wastewater treatment plant and to its continuous operating mode; on other machines and in other modes the figures may differ. The treatment was performed and the reports prepared by ChPKP Rigonda — the contractor for the work. The original reports with signatures and stamps are published in full and available for download.
Current equivalent
Revitalizant gel for compressors and bearings →
Piston, screw and centrifugal compressors; rolling and sliding bearings running in an oil bath; machine-tool spindle units and slideways.
How such units are treated: