INDUSTRIAL CASE STUDY|WATER UTILITY · WASTEWATER TREATMENT|TURBO BLOWER · BEARINGS

REPORTS UNDER THE CONTRACT OF 04.12.2002 · FOUR MONTHS OF OBSERVATION

Turbo blower TV-175/1.6: less energy, bearings without regreasing

Evpatoria PPVKH water utility, wastewater treatment plant  ·  approved by L. I. Vorobyov, head of the PPVKH; for the customer — chief engineer V. I. Kovalenko and WWTP manager I. A. Stepanov; work performed by ChPKP Rigonda

Evpatoria, AR Crimea, Ukraine  ·  treatment 16.12.2002 · observation 09.12.2002 – 08.04.2003 · report of 08.04.2003

PRODUCTXADO compounds for bearingscompressor gel — into the turbine oil bath · revitalizing grease 120 ml and protective grease 125 ml — into the electric motor bearings
TEST OBJECTTurbo blower TV-175/1.6, inv. No. V-4250 kW, 3000 rpm · 4 bearings treated: 2 of the turbine and 2 of the drive electric motor
DOCUMENT TYPEReports on work performed
under the contract of 04.12.2002

Key results

5,8%
average daily electricity consumption of the turbo blower, 5195.14 → 4894 kWh/day
65%
bearing running time between grease refills, 1000 → 1654 h
UNIT AND TREATED ASSEMBLYCONDITION AT THE START OF TESTINGWHAT WAS MEASURED
Turbo blower TV-175/1.6, inv. No. V-4 — 250 kW, 3000 rpm, continuous duty at the WWTPIn service, current load 383 A against a rating of 385 ± 5 ADaily electricity consumption by meter, current load
Turbine bearings (2) — XADO compressor gel into the 0.5 l oil bathRunning time 478 h as of 16.12.2002Running time between refills of the standard grease
Electric motor bearings (2) — XADO revitalizing and protective greaseRunning time 478 h as of 16.12.2002Running time between refills of the standard grease

Electricity: daily consumption before and after treatment

PERIODDAILY CONSUMPTION, kWhCHANGE
Before treatment, 09-16.12.2002 (7 days)5195.14 on average, 4989.6-5371.2 by day
After treatment, 25.01-09.02.2003 (16 days)4894 on average, 4665.6-5142 by day−301.14 kWh/day · 5.8 %

Metering by electricity meter No. 019204 (current transformers 600/5); readings were taken daily at 08.00.

Electricity: Q1 2003 by meter readings

PERIODCALCULATED AT PRE-TREATMENT CONSUMPTION, kWhACTUAL BY METER, kWhSAVINGS
08.01-08.02.2003145468.3136893.608574.8 kWh · 5.9 %
08.02-08.03.2003145468.3139108.806359.6 kWh · 4.4 %
08.03-08.04.2003161054.3151730.409323.9 kWh · 5.8 %
Total for the quarter, 87 days of operation451991427732.824258.3 kWh · 5.4 %

The report conclusions state savings of 6.9 % for the month of the experiment — this figure also covers the turbine bearing cooling pump (3.3 kW) taken out of service.

Bearings and current load of the electric motor

PARAMETERBEFORE TREATMENTAFTER TREATMENT
Bearing running time without refilling the standard greaseper schedule — every 1000 h1654 h of operation with no stop for regreasing
Current load of the electric motor, rating 385 ± 5 A383 A330 A
Turbine bearing cooling pump, 3.3 kWin operationtaken out of service, 5512.32 kWh per quarter

The plant's standard schedule calls for grease refilling of the bearings every 1000 h; during the observation period the machine was not stopped for regreasing.

Report conclusions

The reports under the contract of 04.12.2002, approved by the head of the Evpatoria PPVKH, record that the use of XADO technology led to a reduction of the friction coefficient in the bearings of the machine; a reduction of mechanical losses; an increase in the interval between repeat servicing of the bearings; lower noise and vibration; a longer service life of the equipment without replacing assemblies and parts; prevention of wear and optimisation of the axial and radial clearances of the bearings; electricity savings of 6.9 %. "The total electricity savings from the introduction of XADO technology at the WWTP of the Evpatoria PPVKH for the first quarter of 2003 amount to 29770.62 kW." Based on the results, the enterprise recommended introducing scheduled preventive treatment of machines and mechanisms by XADO technology instead of scheduled routine servicing of equipment at all PPVKH facilities.

The results relate to the 250 kW TV-175/1.6 turbo blower at the Evpatoria wastewater treatment plant and to its continuous operating mode; on other machines and in other modes the figures may differ. The treatment was performed and the reports prepared by ChPKP Rigonda — the contractor for the work. The original reports with signatures and stamps are published in full and available for download.

Current equivalent

Revitalizant gel for compressors and bearings →

Piston, screw and centrifugal compressors; rolling and sliding bearings running in an oil bath; machine-tool spindle units and slideways.

How such units are treated: BearingsCompressorElectric motor

← Full catalogue