TECHNICAL REPORT OF THE LOCOMOTIVE DEPOT, 07.07.2004
ChME-3 locomotive HPFP: delivery of worn elements restored without teardown
commission signatures, seal
Key result
| EQUIPMENT | CONDITION AT START OF WORK | WHAT WAS MEASURED |
|---|---|---|
| ChME-3 locomotive No. 3329, shunting | HPFP in service, worn: element delivery 60-130 ml, spread between elements more than twofold | Delivery of plunger pairs I–VI on the depot shop test bench |
HPFP plunger pair delivery before and after treatment
| PLUNGER PAIR | DELIVERY BEFORE, ml | DELIVERY AFTER, ml | CHANGE |
|---|---|---|---|
| I | 130 | 137 | +5.3 % |
| II | 114 | 232 | +103 % |
| III | 60 | 95 | +58.3 % |
| IV | 118 | 199 | +68.6 % |
| VI | 90 | 208 | +131 % |
Depot shop test bench: 100 rpm, cycle 2 min, conditions before and after identical. The smallest gain is on element I, the least worn one: its delivery before treatment was the highest.
Depot decision
The results refer to the high-pressure fuel pump of shunting locomotive ChME-3 No. 3329 of the Tbilisi Locomotive Depot; on other equipment and under other operating modes the figures may differ. The original technical report dated 07.07.2004, with signatures and seal, is published in full and available for download.
Current equivalent
Revitalizant gel for hydraulic systems →
Hydraulic systems of industrial and special equipment, pumps, motors and valves; gearboxes with oil filtration.
How such units are treated:
