PB-28 piston compressor — JSC Krym

← Full catalogue

TECHNICAL REPORT|COMPRESSOR EQUIPMENT|PB-28 PISTON COMPRESSOR

TECHNICAL REPORT No. 2 · JSC KRYM

PB-28 compressor: higher discharge pressure without dismantling the unit

JSC Krym — customer  ·  Rigonda (private production company) — treatment contractor  ·  approved by the directors of both parties: I. E. Yaskevich, A. B. Boyko

Ukraine  ·  treatment 19-21 August 2003 · report dated 21.08.2003

PRODUCTXADO revitalizant compoundsrevitalizant gel · Application Instruction No. 004 XADO-2002
TREATED OBJECTPB-28 piston compressorthree treatment stages, 19-21 August 2003 · without dismantling the unit
DOCUMENT TYPETechnical Report No. 2
signed and stamped

Key result

12.5%
compressor discharge pressure, 4.0 → 4.5 atm
EQUIPMENTCONDITION AT THE START OF TESTINGWHAT WAS MEASURED
PB-28 compressorDischarge pressure 4.0 atm, elevated operating noiseDischarge pressure after each treatment stage

Compressor discharge pressure by treatment stage

STAGEDISCHARGE PRESSURE, ATMCHANGE VS. BASELINE
Before treatment4.0
After stage 14.2+5 %
After stage 24.5+12.5 %
After stage 34.5+12.5 %

Measurements were taken before treatment and after each of the three stages within one cycle; the pressure reached 4.5 atm already after the second stage.

What else changed in the unit's operation

WHAT WAS OBSERVEDAS RECORDED IN THE REPORT
Suction vacuumIncreased noticeably after the first treatment stage
Operating noiseNoise of the running unit decreased
Oil levelUnchanged after the third treatment stage — oil loss stopped

Assessments are those of the contractor and the customer in the report; the document gives no numerical measurements for these observations.

What the report records

The PB-28 compressor was treated in three stages on 19-21 August 2003, without dismantling the unit. Already after the first stage the report notes that “the suction vacuum and the discharge pressure of the compressor increased noticeably” and that the noise of the running unit decreased; by the third stage the discharge pressure had risen from 4.0 to 4.5 atm, and the oil level stopped falling. The parties then verified the result directly: “After 32 hours of operation of the unit with the oil in the crankcase into which the revitalizant gel had been introduced, on the initiative of the ‘Customer’ and under the guarantees of the ‘Contractor’, an experiment was carried out — STARTING THE COMPRESSOR WITH NO OIL IN THE SYSTEM. The treated compressor ran for 2 minutes. The results of the experiment clearly demonstrated the effectiveness of XADO technology.”

The results relate to the PB-28 piston compressor treated in three stages with XADO technology; on other units and operating modes the figures may differ. The original Technical Report No. 2 dated 21.08.2003, signed and stamped, is published in full and available for download.

Current equivalent

Revitalizant gel for compressors and bearings →

Piston, screw and centrifugal compressors; rolling and sliding bearings running in an oil bath; machine-tool spindle units and slideways.

How such units are treated: Compressor