# TEM2K locomotive No. 1084 — Dalnevostochnoe Locomotive Repair Depot

**IE S030**  
Dalnevostochnoe Locomotive Repair Depot · Russia · 2009

Crankshaft bearing clearances tightened, gear teeth built up metal, the compressor began pumping faster. Russia · 2009. 6.7 % — KT-6 compressor output.

## Measured

- oil clearance of engine connecting-rod bearing shells, 0.14-0.19 → 0.09-0.17 mm — **15 %**
- tooth thickness of wheel-motor block bull gears, 17.8 → 18.0-18.1 mm — **0.2-0.3 mm**
- KT-6 compressor output, fill time 30 → 28 s — **6.7 %**
- engine oil pressure at controller notches, 2.5-4.8 → 2.7-5.0 — **3.8 %**

## Conclusion

Crankshaft bearing clearances tightened, gear teeth built up metal, the compressor began pumping faster

Page: https://industry.xado.com/case/akt_rld_dalnevostochnoe_lokomotiv_tem2k_o10_2009g
PDF report: https://industry.xado.com/pdf/TIER%20S/FarEastLocoDepot/locomotives-TEM2K-1084/IE-S030_XADO_FarEastLocoDepot_locomotives-TEM2K-1084_EN.pdf
Original scan: https://industry.xado.com/scans/akt_rld_dalnevostochnoe_lokomotiv_tem2k_o10_2009g.pdf
