# Turbo blower TV-175/1.6, inv. No. V-4 — Evpatoria PPVKH water utility

**IE B031**  
Evpatoria PPVKH water utility · Ukraine · 2003

Power consumption dropped, bearings ran longer than the schedule without regreasing. Turbo blower TV-175/1.6, inv. No. V-4, Evpatoria PPVKH water utility.

## Measured

- average daily electricity consumption of the turbo blower — **5.8 %**
- bearing running time between grease refills — **65 %**

## Conclusion

Power consumption dropped, bearings ran longer than the schedule without regreasing

Page: https://industry.xado.com/case/otchet_ppvkkh_evpatoriiskoe_turbokompressor_tv_175_1_6_g
PDF report: https://industry.xado.com/pdf/TIER%20B/EvpatoriaVKKh/turbocompressors-TV-175-1-6/IE-B031_XADO_EvpatoriaVKKh_turbocompressors-TV-175-1-6_EN.pdf
Original scan: https://industry.xado.com/scans/otchet_ppvkkh_evpatoriiskoe_turbokompressor_tv_175_1_6_g.pdf
