EN
FIELD CASE STUDY|CONSTRUCTION|COMPRESSOR UNITS

IE B037TREATMENT REPORTS ON TWO COMPRESSORS · 10.06.2002

PKS-3.5 and PKSD-5.25 compressors: output increased without disassembly

Time to reach operating pressure shortened on both machines, pressure in the lubrication system rose. 75 % — output of PKS-3.5, time to reach 7 kgf/cm² 35 → 20 s; 43 % — output of PKSD-5.25, time to reach 7 kgf/cm² 20 → 14 s; 1–2 kgf/cm² — lubrication system pressure, 1–2 → 3 kgf/cm² on both compressors (2002).

NTC Stroy-Servis LLC, Volgograd — performed the treatment, signature and stamp  ·  on the customer's side the reports were signed by the repair shop mechanic

Russia  ·  two reports dated 10.06.2002

PRODUCTXADO compound for compressorsreferred to in the reports as “XADO technology”; treatment without disassembly
TEST OBJECTTwo compressorsPKS-3.5 and PKSD-5.25 · both worn before treatment
DOCUMENT TYPETwo treatment reports
with signatures and stamp
one report per compressor, same date

Key results

↑75%
output of PKS-3.5, time to reach 7 kgf/cm²35 → 20 s
↑43%
output of PKSD-5.25, time to reach 7 kgf/cm²20 → 14 s
↑1–2kgf/cm²
lubrication system pressure,1–2 → 3 kgf/cm² on both compressors
COMPRESSORCONDITION BEFORE TREATMENTWHAT WAS MEASURED
PKS-3.5Worn · build-up to 7 kgf/cm² in 35 s · lubrication system pressure 2 kgf/cm²Time to build up excess pressure to 7 kgf/cm²; lubrication system pressure
PKSD-5.25Worn · build-up to 7 kgf/cm² in 20 s · lubrication system pressure 1 kgf/cm²Same

Measurements before and after treatment — both compressors

COMPRESSORPARAMETERBEFOREAFTERCHANGE
PKS-3.5Time to build up excess pressure to 7 kgf/cm²35 s20 s−15 s
PKS-3.5Lubrication system pressure2 kgf/cm²3 kgf/cm²+1 kgf/cm²
PKSD-5.25Time to build up excess pressure to 7 kgf/cm²20 s14 s−6 s
PKSD-5.25Lubrication system pressure1 kgf/cm²3 kgf/cm²+2 kgf/cm²

According to the conclusion of the contractor, the output of PKS-3.5 rose by 70 % and that of PKSD-5.25 by 43 %; recalculation from the pressure build-up time gives 75 % and 43 %.

Conclusion of the reports

Both compressors arrived for treatment in a worn condition: PKS-3.5 took 35 s to build up the working pressure of 7 kgf/cm², while the lubrication system pressure of PKSD-5.25 stayed at 1 kgf/cm². No disassembly of the units was required. In the conclusion for each compressor the contractor recorded: “After treatment of this compressor using XADO technology, the output of the compressor increased by 70 %” (PKS-3.5) and “increased by 43 %” (PKSD-5.25), “which means that the worn parts were restored”, and recommended “treating similar equipment in order to extend service life and the interval between overhauls”. The time to build up working pressure was reduced on both machines, and the lubrication system pressure increased on both — to 3 kgf/cm².

Current equivalent

Revitalizant gel for compressors and bearings →

Piston, screw and centrifugal compressors; rolling and sliding bearings running in an oil bath; machine-tool spindle units and slideways.

How such units are treated: Compressor

About this result: Oil pressure

Limits of this report: The results relate to the PKS-3.5 and PKSD-5.25 compressors treated in June 2002; on other equipment and under other operating conditions the figures may differ. The treatment was performed and the conclusion on the magnitude of the effect was drawn by one and the same contractor — NTC Stroy-Servis LLC.

Request a pilot for this unit

XADO Pilot Testing Programme

Application submitted by

Pilot treatment on the enterprise's equipment

  • any oil- or grease-lubricated assemblies: gearboxes, engines, compressors, bearings and others;
  • treatment within the regular operating cycle, without halting production;
  • instrumental measurements before and after: vibration, temperature, power consumption or current;
  • procedure for the specific assembly, dose calculation and support from a XADO engineer.

After the application, a XADO engineer will agree the units and the list of measurements with you.