EN

Screw refrigeration compressor

A refrigeration unit: its output is judged not by how fast the receiver fills, but by how often the compressor starts up to hold the temperature in the chamber.

Screw refrigeration compressor, 200 l oil sump

The class norm is 0.8 ml per litre in 5 stages. For the refrigeration unit, 1.5 ml/l in 3 stages has been assigned. Screw and centrifugal compressors →

What is treated

What is measured before and after

ParameterInstrumentHow and when
Output — time to fill the receiver to a fixed pressurestopwatch—
Power draw or current with the compressor unloaded and at a fixed pressureclamp meter, wattmeter—
Oil pressure in the lubrication systemstandard pressure gaugeAt operating temperature.
Output — by start-up frequencyobservation and stopwatchHow many times the compressor starts up to hold a fixed temperature in the cold chamber.

Dosage rates

CompoundRateHow and when
Gel for compressors and bearings1.5 ml per 1 litre of the standard oil per stage200 l sump: 300 ml per stage, 900 ml for three stages.

Treatment stages

  1. In a separate vessel, dilute the gel in standard oil heated to 50–60 °C (1 part gel to 5–10 parts oil), stir until fully dissolved and add to the crankcase of the warmed-up compressor.Start of total operating-time count
  2. The second stage is the same as the first.After 8–12 hours of total operating time
  3. The third stage is the same as the first.After a further 8–12 hours of operating time

After treatment

Points to watch

Screw and centrifugal compressorsCompressor

Source: XADO applied procedure, lead engineer I. N. Sharaikin. Class norm — instruction IE-24.6-25612000-005-2008, procedure No. 2.

XADO Pilot Testing Programme

Application submitted by

Pilot treatment on the enterprise's equipment

  • any oil- or grease-lubricated assemblies: gearboxes, engines, compressors, bearings and others;
  • treatment within the regular operating cycle, without halting production;
  • instrumental measurements before and after: vibration, temperature, power consumption or current;
  • procedure for the specific assembly, dose calculation and support from a XADO engineer.

After the application, a XADO engineer will agree the units and the list of measurements with you.