KT-6 Compressor

Two-stage reciprocating compressor of the brake system of TEM-2, TGM-4, TGM-6 and ChME3 diesel locomotives. Treated without removal from the locomotive, through the oil bath of the crankcase.

KT-6 and KT-6El air compressors of diesel locomotives: treatment in service and during assembly at the factory

The class norm is 1.5 ml per litre of the standard oil. For the locomotive compressor the XADO engineer prescribed a different breakdown: not a share per litre, but whole tubes by stage — this is easier on a locomotive, where the bath is not measured but its rated volume is known. Piston compressors →

What is treated

What is measured before and after

ParameterInstrumentHow and when
Output — the time to fill a separate closed receiver up to working pressurestopwatch, calibrated pressure gauge on the receiverThe measurement is repeated with the shut-off valves in good order, from one and the same initial pressure.
Vibration level at fixed points of the frame, in the vertical, horizontal and axial directionsvibrometerThe points are in the area of the main bearings of the crankshaft.
Noise level at fixed pointssound level meterAt a fixed distance, with no extraneous noise sources present.
Power consumption or current with the compressor unloaded and under loadclamp meter, wattmeter, multimeterThe standard pointer instruments will not do — they lack sensitivity.
Oil pressure at a fixed operating temperaturestandard calibrated pressure gauge
Operating temperature of the lubrication systemliquid-filled or non-contact infrared thermometer

Dosage rates

CompoundRateHow and when
XADO revitalizant gel for compressors and bearings — class norm1.5 ml per 1 litre of the standard oil per stageMethodology No. 1 of the instruction, for reciprocating compressors in general.
Compressor of the TEM-2 diesel locomotive — 13.8 l bath6 tubes of 9 ml: 2 + 2 + 28–12 hours of compressor running time between stages.
Compressor of the TGM-6 diesel locomotive — 11 l bath5 tubes of 9 ml: 1 + 2 + 28–12 hours of running time between stages.
Compressor of the TGM-4 diesel locomotive — 8 l bath4 tubes of 9 ml: 1 + 1 + 28–12 hours of running time between stages.

Treatment stages

  1. In a separate vessel, dilute the gel in a small amount of the standard oil heated to 50–60 °C, in a proportion of 1 part gel to 5–10 parts oil, stir until fully dissolved and introduce into the crankcase through the oil filler neck. Start the compressor and run it in the normal mode without overloads.Start of the total running time count
  2. The second stage is done in the same way as the first.After 8–12 hours of total running time
  3. The third stage is done in the same way as the first.After a further 8–12 hours of running time

After treatment

Points to watch

Special case: treatment during assembly at the manufacturing plant

A separate XADO methodology for a new compressor on the assembly line. The task here is different — not to restore wear, but to match the parts to one another during run-in.

Where КТ-6 has already been treated

  1. Dalnevostochnoe Locomotive Repair Depot · 2009↓ 15% — oil clearance of engine connecting-rod bearing shells, 0.14-0.19 → 0.09-0.17 mm
  2. JSC «Rzhevsky Sakharnik» · 2009↑ 7-17% — diesel cylinder compression, 560 rpm, 23-29 → 26-30 kgf/cm²
  3. WSRC "Permskie Mashzavody", Kungur · 2007↑ 31% — compressor output, pressure reached in 2 min 28 s → 1 min 53 s
  4. Stoilensky GOK · 2003↑ 6-25% — cylinder wall hardness, 269-278 → 292-347 HB
  5. Tbilisi Locomotive Depot · 2003↑ 40% — output, build-up to 7-8 atm (g), 14 → 10 s
  6. Rogan Company LLC · 2000↑ 15.4% — compressor output, pump-up to 7.9 atm

Source: XADO applied methodology "Methodology for treating KT-6 air compressors" and "Calculation of the quantity of XADO formulations for treating a unit", lead engineer I. N. Sharaikin. Class norm — instruction IE-24.6-25612000-005-2008, methodology No. 1.